In 1957, the Sydney Opera House was expected to be finished by 1963 for about seven million Australian dollars. It opened in 1973. The final bill came to a hundred and two million.
Ten years late. Nearly fifteen times the budget.
Douglas Hofstadter later gave the phenomenon a name. Hofstadter's law: it always takes longer than you expect, even when you take into account Hofstadter's law. Fittingly, he coined it in 1979 while writing about computer chess, a milestone researchers had confidently predicted back in the late 1950s would arrive within a decade. Deep Blue finally beat the world champion in 1997.
I laughed the first time I read that. Then I stopped laughing, because it describes nearly every product we've ever built.
We know the law. We plan for it. We pad the schedule, sometimes double it, and the dates still slip. Fred Brooks wrote a whole book on the subject, The Mythical Man-Month, and gave us Brooks's law along the way: adding people to a late project makes it later. Engineers pass that book around like scripture and miss their dates anyway.
Why so far off? Why can't we nail it?
It's the last part of the job that can't be scheduled—what PS Audio Chief Engineer Bob Stadtherr refers to as the second 90% of any project. It's the tuning. A thousand small choices about a part here and a value there, a capacitor swapped, a ground path moved, played over and over through the reference system until the players walk into the room and stay. Nobody knows how long that takes, because nobody knows it's done until it is. And a product isn't done until it is.
Has your own system ever cooperated with a schedule? How long did you figure the last speaker setup would take—an afternoon? And how many weeks later were you still nudging a speaker a quarter inch, waiting for the evening the singer finally locked into place?
The calendar says Tuesday.
The music decides.